Raby Bay, QLD
Pontoon Installation
Dura-Base matting served as a stable crane platform for a pontoon installation by the coast at Raby Bay, QLD. The mats ensured the safe operation of the crane near the water s edge.
Composite matting for civil construction, earthworks, road building and pipeline projects. Heavy civil works demand reliable ground access solutions that perform in all conditions. Our matting systems provide temporary roadways, equipment platforms, and site access that protect the ground surface and keep your construction programme on schedule, regardless of wet weather or soft ground conditions.
Our team understands the specific regulatory and operational challenges of the Construction sector. We provide tailored ground protection solutions that ensure compliance and continuity.

The construction of Brisbane Airport's new runway included the installation of HIAL runway lights. Dura-Base mats were utilised as a stable piling platform for a 280-tonne crane operating with a vibro-hammer, mitigating wet weather risks.
Raby Bay, QLD
Dura-Base matting served as a stable crane platform for a pontoon installation by the coast at Raby Bay, QLD. The mats ensured the safe operation of the crane near the water s edge.
Gladstone, QLD
The QAL Waste Line Replacement project involved the installation of an 8.8 km above-ground pipeline at Queensland Alumina’s Gladstone refinery. The project required a low-impact solution to gain access for installing the new line while operations continued, as well as for the removal of the old line and piling upgrades to existing structures.