Onslow, WA
Wheatstone
The Wheatstone project required geotechnical drilling operations over a period of 12 months. Dura-Base mats were essential for providing access to the site, as the soft ground conditions caused standard all-terrain vehicles to bog. Additionally, the mats protected heavy machinery from the corrosive acid sulphate soils present on site.